You've received a construction estimate. Maybe two or three. Now you need to understand what you're looking at — which numbers are real, which are low-ball, and whether the scope covers everything your project requires.

Level of Detail: The First Thing to Check

A one-page estimate with a single lump-sum number tells you almost nothing. A professional estimate breaks the project into trade-by-trade line items — framing, electrical, plumbing, HVAC, roofing, finishes — with quantities and unit costs for each. Lump-sum estimates from contractors who don't want to show their work are a major red flag.

Key Line Items to Scrutinize

General Conditions

General conditions cover the contractor's project management costs — superintendent time, temporary facilities, small tools, insurance, and site overhead. For a typical residential project, general conditions should run 8–15% of construction cost. If this line item is missing, it's either hidden in other line items or forgotten.

Permits and Fees

Permits should always be a separate, explicitly stated line item. In LA, permit fees are significant — often $8,000–$20,000 for a home addition or ADU. If the estimate says "owner to supply permits" or lumps permits into an ambiguous line, clarify exactly what's included.

Allowances vs. Specified Items

Watch for allowances — placeholders like "$5,000 fixture allowance." Allowances are almost always set too low by contractors who want their total number to look competitive. When actual selections are made, the allowance is exceeded and change orders follow. Always ask contractors to specify exactly what's included.

Exclusions List

Every professional estimate should include an exclusions list — a clear statement of what is NOT included. Common exclusions: hazardous material abatement, utility upgrades, landscaping restoration, furniture and appliances. If there's no exclusions list, assume the scope is narrower than you think.

Comparing Multiple Bids

Never compare total numbers without comparing scope. A $180,000 bid and a $240,000 bid for the same project may actually be the same price once you account for different assumptions about allowances, exclusions, and contingency. List every line item from the most detailed bid and ask each contractor to confirm their coverage of each item.

Red Flags in a Construction Estimate

  • Lump-sum pricing with no breakdown — no way to verify or compare
  • Unusually low labor costs — often signals unlicensed subcontractors
  • Missing permit line items — permits will be a change order later
  • No contingency — every real project has unexpected conditions; 5–10% is standard
  • Very low allowances — set low intentionally to look competitive
  • No exclusions list — the contractor hasn't thought through the full scope

Get a Second Opinion

If you've received a construction estimate and aren't sure whether the numbers are realistic, Priority One Builders offers bid review services. We analyze contractor proposals against your project documents and give you an independent assessment of whether the bid is accurate and competitive. Contact us to discuss your project.

Get Started Today

Ready to Start Your Project?

Contact Los Angeles' most trusted general contractor for a free consultation and estimate.

Or call directly: (818) 839-0011